The major challenge with this project is the size and volume of the building in addition to the storage of combustible materials resulting in the requirements of ‘high hazard’ fire sprinklers complete with fire storage tanks and pumps. erbas™, working closely with the appointed building surveyors and fire safety engineers, have managed to optimise the design to provide the best outcome for the client.