The building designs include but are not limited to maximum security accommodation (330 beds), movement control, visits, pre-visits, administration, medical wings and detox cells, property store, segregation wing, bulk store, industries building, and modifications to four other buildings currently operating on the site. erbas™ also completed the previous $58 Million extension in Cessnock in 2010. Construction value: $130 million